Connect with us
DNV Decarbonization Insight Series August 2026 - What maritime professionals should know about AI Training

Alternative Fuels

Goodfuels to commence Bio-fuel trials with UECC

M/V Autosky will test Bio-Fuel Oil on its normal route, reducing more than 6,500 metric tonnes of CO2 emissions on a well-to-wake basis.

Admin

Published

on

UECC

Netherlands-based sustainable biofuels company GoodFuels on Friday (6 March) said a joint trial of GoodFuels Bio-Fuel Oil (MR1-100 or BFO) on UECC’s ro-ro vessel M/V Autosky has been launched.

The three-month trial will test 3,000 metric tonnes (mt) of sustainable biofuel on the 140m, 2,080 unit capacity vehicle carrier – a significant step in advancing marine biofuel for the ro-ro segment. 

The biobunkering, which will take place in the Port of Rotterdam, will be the first in a series of bunkering operations between March and May 2020. 

M/V Autosky will test BFO on its normal route between Zeebrugge, Belgium and Santander, Spain and will result in a reduction of more than 6,500 metric tonnes of CO2 emissions on a well-to-wake basis.

As the industry is under increasing pressure to decarbonise, sustainable marine biofuel effectively allows shipowners and operators to comply with both the 2020 0.50% sulphur cap, as well as future regulations on carbon reduction by 2030 and 2050.

GoodFuels’ BFO is the first ever residual fuel-equivalent biofuel, requiring no changes to marine engines. The biofuel ‘drops in’ to normal fuel tanks, virtually eliminating CO2 and substantially reducing SOX. Due to the absence of sulphur, the Bio-Fuel Oil can also be used to replace distillate fuels.

“At UECC, we pride ourselves on supporting sustainable solutions to the issues that our planet faces. We are excited to play a leading role in accelerating sustainable biofuel uptake for the ro-ro segment,” said Daniel Gent, Energy & Sustainability Manager, UECC. 

“We are proud to be bunkering sustainable marine Bio-Fuel Oil on M/V Autosky, kicking off the first use of low-carbon fuels with our friends and partners at UECC,” said Isabel Welten, CCO, GoodFuels.

“This trial will help UECC to further prove the applicability and technical suitability of biofuels for the ro-ro segment.”

“Importantly, we also want to prove to leading car manufacturers that biofuels are a great way to immediately decarbonise their cargo and help change the sector for the better.”

Following the trial period UECC and GoodFuels will explore further options for continuing marine biofuel uptake within the ro-ro segment.


Photo credit: GoodFuels
Published: 6 March, 2020

 

Continue Reading

LNG Bunkering

Shell expands LNG bunkering footprint in Spain with Valencia

As one of the region’s key maritime hubs, the company said Valencia expands the options available to shipowners seeking LNG supply along major shipping routes.

Admin

Published

on

By

Shell expands LNG bunkering footprint in Spain with Valencia

British oil giant Shell on Thursday (13 August) said Valencia has joined its growing network of bunkering locations, making LNG available as a marine fuel.

The successful completion of the first LNG bunkering operation in Valencia marked an important milestone for Spain and further strengthened Shell’s LNG supply capabilities across the Mediterranean. 

In a video shared by the company, bunkering vessel Alice Consulich was shown supplying an undisclosed volume of LNG to the container ship MSC Sabrina.

“As one of the region’s key maritime hubs, Valencia expands the options available to shipowners seeking LNG supply along major shipping routes,” Shell said in a social media post. 

Shell said the achievement reflected the strong collaboration across the maritime value chain, including MSC Mediterranean Shipping Company, the Port of Valencia and Fratelli Cosulich Group.

“We look forward to making more LNG bunker deliveries in Valencia and across the Mediterranean as LNG infrastructure and capabilities continue to expand,” the company said. 

 

Photo credit: Shell
Published: 14 August, 2026

Continue Reading

LNG Bunkering

Énestas and Power LNG join forces on Galveston bunkering

Énestas will provide capital, LNG transport and storage equipment, and downstream expertise to support Power LNG’s planned liquefaction and marine bunkering facility on Pelican Island.

Admin

Published

on

By

Stabilis Solutions enter 10-year LNG bunkering supply deal for Port of Galveston

Power LNG (Power LNG) and Mexico’s LNG infrastructure and downstream natural gas company Énestas on Wednesday (12 August) announced the execution of definitive agreements establishing a strategic partnership to accelerate the development of LNG infrastructure at the Port of Galveston.

Under the agreement, Énestas will provide capital, LNG transportation and storage equipment, and downstream operating expertise to support the development of the Harborside Terminal and Project Seawolf, Power LNG’s planned LNG liquefaction and marine bunkering facility on Pelican Island.

The partnership creates an immediate pathway to begin LNG distribution by truck while Project Seawolf is under development, supporting marine fueling, virtual pipeline customers, industrial users, and LNG exports throughout the Gulf Coast, Latin America, and the Caribbean.

“Our vision has always been to establish Galveston as the premier LNG hub for the Gulf Coast,” said Austin Terry, Founder and CEO of Power LNG. 

“Énestas brings years of operational experience, proven LNG infrastructure, and a talented team that understands how to deliver LNG safely and efficiently. Together, we can immediately begin serving customers while laying the foundation for one of the most strategic LNG bunkering facilities in North America.”

Project Seawolf will provide LNG for marine bunkering, truck loading, virtual pipeline distribution, and international exports. The facility is strategically located at the Port of Galveston, serving one of the fastest-growing cruise, cargo, and energy corridors in the United States.

For Énestas, the transaction represented an important milestone in the company’s international growth strategy.

“This partnership represents a natural evolution for Énestas as we expand our downstream LNG business into the United States,” said Caio Zapata, Chief Executive Officer of Énestas. 

“For more than a decade, Énestas has developed and operated LNG infrastructure throughout Mexico, helping customers transition to cleaner, more reliable energy. Partnering with Power LNG allows us to leverage that experience in one of the most attractive LNG markets in North America. We see tremendous opportunities in marine bunkering, virtual pipeline logistics, industrial LNG supply, and exports to Latin America and the Caribbean, and we are excited to build that future together.”

The companies expect the partnership to support near-term LNG truck loading operations while advancing the long-term development of Project Seawolf, which is designed to become a regional hub for LNG production, marine fueling, and distribution.

The collaboration also establishes a platform to pursue additional downstream LNG opportunities throughout the Gulf Coast, utilising Énestas’ operational expertise together with Power LNG’s project development capabilities.

 

Photo credit: Port of Galveston
Published: 14 August, 2026

Continue Reading

LNG Bunkering

Stabilis delivers more than 150,000 cbm of LNG bunker fuel at Galveston

Company says the advancement of its proposed Stabilis Galveston LNG Facility is a natural progression of its established LNG bunkering footprint in Galveston.

Admin

Published

on

By

Stabilis delivers more than 150,000 cbm of LNG bunker fuel at Galveston

Clean energy production solutions provider Stabilis Solutions (Stabilis) on Thursday (13 August) said it has completed 97 LNG bunkering operations and delivered more than 150,000 m³ of LNG to customers in the Port of Galveston.

“As the only physical supplier of LNG on the Gulf Coast to reach this milestone, we’ve earned a reputation as a trusted, proven operator — both with local Galveston stakeholders and with the world’s largest cruise operator,” the company said in a social media post.

“That trust is reflected in the 10-year LNG offtake agreement we executed in December 2025.”

The company said the advancement of its proposed Stabilis Galveston LNG Facility is a natural progression of its established LNG bunkering footprint in Galveston. 

“As a Houston-based company, we believe in the Texas economy and the future growth of the Port of Galveston,” it added.

“That belief is why we’ve invested heavily over the past four years in the planning, permitting, and engineering design work to develop the most advanced, derisked, shovel-ready small-scale LNG liquefaction project on the Gulf Coast.”

Manifold Times previously reported Stabilis stating that the proposed Stabilis Galveston LNG Facility is anticipated to be in production by the third quarter of 2028.

It will come complete with the delivery of the first new-build, dedicated Jones Act-compliant LNG bunker barge in the Galveston/Houston area.

This comes following Stabilis receiving a Letter of Recommendation from the US Coast Guard following their formal review of the proposed Stabilis Galveston LNG Facility and associated waterfront LNG loading, marine transportation, and LNG bunkering operations in the Port of Galveston.

Related: Stabilis Solutions targets Q3 2028 launch for Galveston LNG bunkering facility
Related: Stabilis Solutions terminates 10-year LNG supply deal, expects delay in Galveston project

 

Photo credit: Stabilis Solutions
Published: 14 August, 2026

Continue Reading

Trending