Connect with us
DNV Decarbonization Insight Series August 2026 - What maritime professionals should know about AI Training

Alternative Fuels

Singapore: Maersk Oil Trading, METS, Mitsui, ABS develop methanol bunkering project

Project targeting to conduct an actual ship-to-ship refuelling operation of green methanol bunker fuel to a vessel in Singapore port during the first half of 2023.

Admin

Published

on

Singapore bunker tankers 1

Mitsui & Co., Ltd. (Mitsui), Mitsui & Co. Energy Trading Singapore Pte. Ltd. (METS), Maersk Oil Trading, a part of A.P Moller – Maersk (MOT) and American Bureau of Shipping (ABS) on Tuesday (4 October) said they have agreed to jointly conduct a detailed feasibility study of methanol bunkering logistics in Singapore.

This joint project is in line with the International Maritime Organization’s (IMO) initial strategy to halve greenhouse gas (GHG) emissions within the shipping industry by 2050 compared to 2008 levels, which is also aligned with the direction of the Maritime and Port Authority of Singapore (MPA) to achieve decarbonization of the maritime industry in Singapore.

Green methanol is expected to be one of the promising alternative marine fuels that has the potential to make significant contributions to reducing GHG emissions in the shipping industry and project participants strongly believe that the establishment of a safe and reliable operational platform is valuable to Singapore as a leading bunkering location globally.

Through the feasibility study, the project participants intend to investigate the design of the bunkering vessel, safe operating procedures, fuel storage and regulatory considerations by utilizing both MOT and Mitsui group’s strong presence in the Singapore marine fuel market. ABS will support the study by providing an operational risk assessment.

This project is targeting to conduct an actual ship-to-ship bunkering operation to a vessel in the first half of 2023.

The project participants have been engaging with various stakeholders in the maritime industry and aim to successfully complete the project and establish a stable alternative fuel supply chain for maritime decarbonization in Singapore.Singapore Methanol joint feasibility study

“At A.P. Moller – Maersk, we have made great progress in identifying sources of green methanol and now developing and proving we can safely deliver it to our vessels is a key priority for us. It will contribute strongly to our target of achieving net zero greenhouse gas emissions by 2040,” said Mikkel Kannegard, Head of Maersk Oil Trading.

“We are pleased to have an opportunity to participate in this joint project in Singapore with reliable and like-minded partners. The project aims to establish a platform for the bunkering of alternative fuel for vessels and will lead to maritime decarbonization. Through this project and other GHG reduction initiatives, Mitsui will continue contributing to the realization of a carbon neutral society,” said Yoshio Kometani, Representative Director, Executive Vice President of Mitsui.

“Methanol presents an immediate and promising solution with practical advantages in storage, handling and carbon intensity reduction potential which is gaining traction in the market. The further development of green methanol (e.g. electrolysis and biogenic carbon) provides a viable option for carbon neutral operations. ABS is proud to be able to use its industry leading experience with methanol vessels to support this project,” said Panos Koutsourakis, ABS Director, Sustainability Strategy.

“As the world’s top bunkering and transhipment hub port, MPA welcomes the news that our shipping industry is working on the use of methanol as a potential marine fuel. We look forward to engaging the participants on their project, the outcomes of which will be useful for the global transition towards sustainable shipping,” said Capt M Segar, Assistant Chief Executive (Operations) of the MPA.

 

Photo credit: Manifold Times
Published: 4 October, 2022

Continue Reading

LNG Bunkering

Shell expands LNG bunkering footprint in Spain with Valencia

As one of the region’s key maritime hubs, the company said Valencia expands the options available to shipowners seeking LNG supply along major shipping routes.

Admin

Published

on

By

Shell expands LNG bunkering footprint in Spain with Valencia

British oil giant Shell on Thursday (13 August) said Valencia has joined its growing network of bunkering locations, making LNG available as a marine fuel.

The successful completion of the first LNG bunkering operation in Valencia marked an important milestone for Spain and further strengthened Shell’s LNG supply capabilities across the Mediterranean. 

In a video shared by the company, bunkering vessel Alice Consulich was shown supplying an undisclosed volume of LNG to the container ship MSC Sabrina.

“As one of the region’s key maritime hubs, Valencia expands the options available to shipowners seeking LNG supply along major shipping routes,” Shell said in a social media post. 

Shell said the achievement reflected the strong collaboration across the maritime value chain, including MSC Mediterranean Shipping Company, the Port of Valencia and Fratelli Cosulich Group.

“We look forward to making more LNG bunker deliveries in Valencia and across the Mediterranean as LNG infrastructure and capabilities continue to expand,” the company said. 

 

Photo credit: Shell
Published: 14 August, 2026

Continue Reading

LNG Bunkering

Énestas and Power LNG join forces on Galveston bunkering

Énestas will provide capital, LNG transport and storage equipment, and downstream expertise to support Power LNG’s planned liquefaction and marine bunkering facility on Pelican Island.

Admin

Published

on

By

Stabilis Solutions enter 10-year LNG bunkering supply deal for Port of Galveston

Power LNG (Power LNG) and Mexico’s LNG infrastructure and downstream natural gas company Énestas on Wednesday (12 August) announced the execution of definitive agreements establishing a strategic partnership to accelerate the development of LNG infrastructure at the Port of Galveston.

Under the agreement, Énestas will provide capital, LNG transportation and storage equipment, and downstream operating expertise to support the development of the Harborside Terminal and Project Seawolf, Power LNG’s planned LNG liquefaction and marine bunkering facility on Pelican Island.

The partnership creates an immediate pathway to begin LNG distribution by truck while Project Seawolf is under development, supporting marine fueling, virtual pipeline customers, industrial users, and LNG exports throughout the Gulf Coast, Latin America, and the Caribbean.

“Our vision has always been to establish Galveston as the premier LNG hub for the Gulf Coast,” said Austin Terry, Founder and CEO of Power LNG. 

“Énestas brings years of operational experience, proven LNG infrastructure, and a talented team that understands how to deliver LNG safely and efficiently. Together, we can immediately begin serving customers while laying the foundation for one of the most strategic LNG bunkering facilities in North America.”

Project Seawolf will provide LNG for marine bunkering, truck loading, virtual pipeline distribution, and international exports. The facility is strategically located at the Port of Galveston, serving one of the fastest-growing cruise, cargo, and energy corridors in the United States.

For Énestas, the transaction represented an important milestone in the company’s international growth strategy.

“This partnership represents a natural evolution for Énestas as we expand our downstream LNG business into the United States,” said Caio Zapata, Chief Executive Officer of Énestas. 

“For more than a decade, Énestas has developed and operated LNG infrastructure throughout Mexico, helping customers transition to cleaner, more reliable energy. Partnering with Power LNG allows us to leverage that experience in one of the most attractive LNG markets in North America. We see tremendous opportunities in marine bunkering, virtual pipeline logistics, industrial LNG supply, and exports to Latin America and the Caribbean, and we are excited to build that future together.”

The companies expect the partnership to support near-term LNG truck loading operations while advancing the long-term development of Project Seawolf, which is designed to become a regional hub for LNG production, marine fueling, and distribution.

The collaboration also establishes a platform to pursue additional downstream LNG opportunities throughout the Gulf Coast, utilising Énestas’ operational expertise together with Power LNG’s project development capabilities.

 

Photo credit: Port of Galveston
Published: 14 August, 2026

Continue Reading

LNG Bunkering

Stabilis delivers more than 150,000 cbm of LNG bunker fuel at Galveston

Company says the advancement of its proposed Stabilis Galveston LNG Facility is a natural progression of its established LNG bunkering footprint in Galveston.

Admin

Published

on

By

Stabilis delivers more than 150,000 cbm of LNG bunker fuel at Galveston

Clean energy production solutions provider Stabilis Solutions (Stabilis) on Thursday (13 August) said it has completed 97 LNG bunkering operations and delivered more than 150,000 m³ of LNG to customers in the Port of Galveston.

“As the only physical supplier of LNG on the Gulf Coast to reach this milestone, we’ve earned a reputation as a trusted, proven operator — both with local Galveston stakeholders and with the world’s largest cruise operator,” the company said in a social media post.

“That trust is reflected in the 10-year LNG offtake agreement we executed in December 2025.”

The company said the advancement of its proposed Stabilis Galveston LNG Facility is a natural progression of its established LNG bunkering footprint in Galveston. 

“As a Houston-based company, we believe in the Texas economy and the future growth of the Port of Galveston,” it added.

“That belief is why we’ve invested heavily over the past four years in the planning, permitting, and engineering design work to develop the most advanced, derisked, shovel-ready small-scale LNG liquefaction project on the Gulf Coast.”

Manifold Times previously reported Stabilis stating that the proposed Stabilis Galveston LNG Facility is anticipated to be in production by the third quarter of 2028.

It will come complete with the delivery of the first new-build, dedicated Jones Act-compliant LNG bunker barge in the Galveston/Houston area.

This comes following Stabilis receiving a Letter of Recommendation from the US Coast Guard following their formal review of the proposed Stabilis Galveston LNG Facility and associated waterfront LNG loading, marine transportation, and LNG bunkering operations in the Port of Galveston.

Related: Stabilis Solutions targets Q3 2028 launch for Galveston LNG bunkering facility
Related: Stabilis Solutions terminates 10-year LNG supply deal, expects delay in Galveston project

 

Photo credit: Stabilis Solutions
Published: 14 August, 2026

Continue Reading

Trending